MSD Seeks Community Dialogue on Investing in Public Health and Safety Protection MSD Breaks Ground on $60 Million Underground Shawnee Park Basin MSD to Break Ground on $60 Million Underground Shawnee Park Basin With Flood Season Here, MSD to Test Slugger Field Floodwall Closure MSD to Honor its Military Veterans in Ceremony MSD to Install Floodwall Closure on Dixie Highway at Kosmosdale Safe Swimming Pool Draining Tips Offered as Summer Closes Aging Infrastructure and Heavy Rains Contribute to Downtown Street Cave-In MSD Hits 4-Decades-Long Goal; Closes Last Outdated Wastewater Facility Demolition of McNeely Lake WQTC MSD to Install Floodwall Closure at Highway 44 and Dixie Highway ORSANCO Ohio River Sweep Media Event